澳门六合彩资料库

SR 99 Tunnel

Alaska Way Viaduct Replacement Tunnel

Project Details

TUTOR PERINI AFFILIATES

澳门六合彩资料库 Civil
Design-Build Contractor
Contract Amount: $1.4 Billion


Electrical Subcontractor
Contract Amount: $122 Million


Mechanical Subcontractor
Contract Amount: $75 Million


TBM Recovery Subcontractor
Contract Amount: $13.6 Million


Drilled-Shaft Subcontractor
Contract Amount: $4.6 Million

OWNER
Washington State Department of Transportation

LOCATION
Seattle, WA

ARCHITECT
HNTB

SIZE
1.8 Miles

COMPLETION
2019

Project Description

The SR 99 Alaskan Way Viaduct is being replaced with an approximately two-mile-long double-deck tunnel underneath downtown Seattle. Replacing the viaduct with a tunnel allows the highway to remain open for much of construction, thus minimizing closures and impacts to traffic. Once the tunnel opens, the viaduct will be taken down to clear the way for new public space along Seattle鈥檚 downtown waterfront.

Seattle Tunnel Partners聽was responsible for designing and building the SR 99 tunnel. In addition to boring the tunnel and building the highway within it, STP聽is responsible for building highway ramps and other connections at the north and south ends of the tunnel. They are also constructing buildings at each tunnel portal to house lighting, ventilation and other systems needed to operate the tunnel.

鈥淭his truly is a remarkable feat of engineering. We've had delays and there鈥檚 still work to be done, but the individuals working on this job should be proud of this accomplishment.鈥
Roger Millar
Secretary
Washington State Department of Transportation

Photo Credits: WSDOT